|
Untitled Document
|
| NOTICES |
 |
| |
|
|
|
|
|
USE GUIDE
ZEF MT 01 PPR PIPE WELDING MACHINE INSTRUCTION BOOK
- preparing welding machine and welding sockets. Clean welding sockets before start to welding.
- Connect plug to 230V power supply socket the orange color lamb will be light it shows there is electricity if orange color lamb doesnt light it mean there is no electricity please check your power supply if there is no problem on current,dont repair machine and return back machine to seller.
- Set thermostat to 270C. During 4 minutes temprature degree will becomes to 270C the green lamb will goes out and the machine will be ready to start to welding .
- Clean part of plastic pipe to be weld
- Cut the pipe at right angles to the pipe axis. Take care that the pipe axis is free From burrs or cutting chips and remove if necessary.
- . Mark the welding depth at the end of the pipe and fitting. Push the end of the pipe, without turning, up to the marked welding depth into the welding sockets.At the same time push the fitting, without turning until the marked welding depth is covered by the bead of ppr from the fitting. The joint elements have to be fixed during the specified assembly time. Use this time to correct the connection. The correction is only restricted to the alignment Of pipe and fitting. Never turn the elements or align the connection after the processing time.After the cooling period the welded joint is ready for use.
MATTERS NEED TO ATTENTION
- Dont use machine without gloves and keep yourself and children and others from iron when it is worm
- Dont touch electric cable and plug to iron
- When welding be finished wait for cooling iron dont put machine to bag when iron is worm.and dont cool iron with water and other liquid ,must to cool by air .
- Dont repair machine becuase it goes out guarantee,return back machine to seller.
- Dont use welding sockets on welding which its teflons be corroded
- Clean welding sockets by using wet cloth
PARTS OF SET
- BAG
- WELDING MACHINE
- LEG
- WELDING SOCKETS
20 |
25 |
32 |
40 |
1\2 |
3\4 |
1 |
1 1\4 |
- CUTTER
- MEASURE
- 2 PCS ALIAN
WELDING PERIOD
PIPE DIAMETER (MM) |
WORMING PERIOD (S) |
WORKING PERIOD(S) |
SOĞUTMA
SÜRESİ (SN) |
16 |
5 |
3 |
3 |
20 |
6 |
25 |
7 |
32 |
7 |
4 |
5 |
40 |
11 |
50 |
17 |
63 |
22 |
6 |
7 |
75 |
28 |
8 |
10 |
|
|